Here's how my design wall is looking on the first of September. Four finishes are pinned-up, as I'm not working on piecing or designing, just doing a lot of quilting at the moment. Those finishes do need to move along and make room for what I'll be working on this coming month.
Note: the use of π₯π½ by a project name indicates that it's on the 2026 UFO Finishes challenge list of six projects that I committed to finishing at the beginning of the year (more on that list later). Note, this is not the same list as the UFO Challenge for BAMQ, that UFO will have this next to it on the list:ππ
QUILTS
Design & Begin
Quilting
Toned-Down Circle Sampler - now that I have the appropriately sized grey background felt, arrange and appliquΓ© the circles, start embroidering.
Y.E.S. Coat - continue making pieces/blocks. assemble on foundation, cut out lining pieces from the fabric that I dyed







































