Here's my 30 seconds of 1SE, One Second Every Day for April in a short video.
Monthly I-Did-It List for APRIL
2. I made more Pantone Project blocks and gave them to friend Jaye.
3. I did some more hand stitching on Snake In The Garden.
4. I did some more hand stitching around my Kawandii at Sew Day.
5. I sewed together the September column for the Temperature Quilt.
6. I designed a quilt in EQ8 for the bamq exhibit at the San Mateo County Fair, paper pieced the four blocks, layered, free-assembled into a top, free motion quilted and then entered the quilt.
7. I packed up for the BAMQ retreat, helped with some of the work of the event, and enjoyed getting a lot of work done.
8. I paper pieced another Y.E.S. for the Y.E.S. coat.
9. I got most of the City Sampler blocks assembled into a top but ran out of sashing material.
10. I made the rest of the blocks for the 5x5 quilt.
I went to the BAMQ retreat and did some family and friends visiting stuff. I continued going to PT for my knee with no improvement and got knee surgery scheduled for May.
I attended several online CST lectures and groups, attended a BAMQ sew day, blogged here 30/30 days woot!, I instagrammed 5 times, threaded 14 times, facebooked 0 times and Blue-sky-ed 11 times.
This month was definitely a productive one given the work and travel of the retreat.
No comments:
Post a Comment