Last month I shared a photo of my design wall and how its crowdedness had changed for the better. It has stayed that way and is now in use again for its main purpose--designing. It's the stuff around the edges that has been getting to me. There's a lot of **stuff** around the edges and in my sightline. That's the project for this moth along with the rest of the to-dos on the list. Rearrange things in a different way, that will help a lot.
So here's my To-Do list for June:
Rearrange the boxes near and around the design wall so they don't impede viewing. See above picture.
Cut out and sew on the second circle on the orange bullseyes
.Sew down the facings and make, and sew on the hanging sleeves and labels for the Prism Triptych.Sew together Faux Goose Chase HST, add borders?, sandwich, quilt, bind, label
Start making Pantone project blocksQuilt, bind and label Courthouse Steps
Quilt, bind and label Kitchen Sink
Make more Japanese Houses blocks
Make blocks for the Y.E.S. coat.
4 comments:
WOW! You have a lot of quilting to do! Better start now.
It's true, it's a lot! A bigger to-do list works a little better for me, more choices, more things to check off.
that makes sense. I imagine this isn't your full to do list, e.g. all UFOs? Is it just the projects that have floated to the top of the pile?
Definitely not the whole UFO/to-do list, just the ones that are floating out and about and not put away in boxes.
Post a Comment