Tuesday, October 01, 2024

Oh Hi There, October

Here we are rolling over into October, and it's 104° F out right now. I'm ready for fall, but fall's not ready for me quite yet I guess. 


The monthly marker above is made from this picture of my almost finished City Sampler, being manipulated in Percolator.

Then also taken over to Snapseed for more adjusting and cropping and adding of the title.

Here's the monthly video of 1SE, one second everyday.

The monthly I-Did List for September is as follows:

  1. I made my next few Stamp Quilt blocks.
  2. I worked on and finished and sandwiched my Ruby+Bee challenge quilt.
  3. I worked on the borders for the City Sampler.
  4. I almost finished the back for the Bohemian Wife quilt.
  5. I gathered and prepared to start the Toned-Down Circle Sampler embroidery project.
  6. I began designing the next piece for Sister Artists.
  7. I got more background fabric for the Pantone Project and worked on my design.
  8. I worked with the Metro Twist scraps for a back for the quilt.
I posted here 18/30 days, I posted on Instagram 1 time, on Threads 10 times, and on BlueSky 4 times. Not so much for the posting last month! I got to two Sew Days for BAMQ, and I virtually attended meetings for a writing/quilting class weekly. We got to have several family visits of differing configurations, as well as going to doctor visits with my Dad.  I'm surprised I got as much done as I actually did this month, so here's to October and hopefully more time and energy for sewing.


No comments: