and then I saw this awesome wool fabric draped over a couch. It would have been fine without using the kaleidacam app, but then I came up with this monthly marker.Monthly I-Did List ~ October
- I sewed together the first block of the quilt I designed for the MQG challenge.
- I took an online class on iPad for quilters.
- I worked on making some pieces for the Y.E.S. Coat.
- I made 7 postage stamp blocks for community giving.
- I sewed more weekly blocks for Patchwork Palooza and put them all up on the design wall.
- I added on both the January and February columns to begin assembly of the Temperature quilt.
- I added the March and April columns to the Temperature Quilt.
- I stitched on Snake in the Garden in the USA and the UK.
October was a jam-packed travel-filled month, I got to travel to Spokane once again to participate in a medical study. This took almost no recovery time as I got a lot less of the shots, because it is working. And then the first week and a half of October I was still traveling with my DH out of the country. And then the last week and a half I road-tripped up to Portland with a friend. So, the amount of work I got done is fairly amazing I suppose as I was hardly at home. I was very active on social media, posted on BlueSky 35 times, on Flashes 11 times, on Instagram 2 times. That was a whole lot! On to a hopefully calmer November ...

No comments:
Post a Comment
I'd love to read what you think about this post!